Batch Equipment Orders On Three Fronts

German-based Zippe recently received two orders from Sisecam and a third from Algeria. Trakya Glass Rus ZAO of Alboga, Russia has ordered a batch plant and factory cullet recycling system for a 750/tpd float line. The plant is designed fro expansion to accommodate the needs of a second 750/tpd furnace. In Turkey, Sisecam Anadolu Cam Eskisehir has ordered a batch plant and factory cullet recycling system for two glass container production lines with a total capacity of 580/tpd. When delivered, these plants will be able to serve two additional furnaces in the future. Separately, Zippe has secured an order from Mediterranean Float Glass in Algeria. Intended for MFGs second float line, this contract involves the supply of a batch plant and charge, glass leveller and controller, together with cullet recycling equipment, enabling 800/tpd to be produced.

Author
Un-named
Origin
Unknown
Journal Title
Glass Worldwide Sept/Oct 2012 16
Sector
News Items
Class
N 2902a

Request article (free for British Glass members)

Batch Equipment Orders On Three Fronts
Glass Worldwide Sept/Oct 2012 16
N 2902a
Are you a member?
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
9 + 0 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.